Locomotive O&K number 10311 was offloaded in Bloemfontein last week. Attached is a preliminary report on work Lucas and his team intend to do.

  • Possible removal of boiler to clean in-between frames water tanks from rust and paint with sealer and anti rust paint.Remove wheels to set wheels in a railway workshop to correct gauge.
  • Remove left and right coal bunkers drivers cab, roof and back plate for riveting as per O&K standards.
  • Fabricate and fit a proper lubrication system for valves and cylinders. (Mechanical lubricator and valves).
  • Rebuild regulator to a safe standard as the regulator is not operating smooth at the moment.
  • Remove boiler cladding to fit proper flanges to boiler to attach clack valves.
  • Replace and refit all steel piping with copper piping on locomotive.
  • Fabricate boiler water level attachments and fit level gauges to O&K standards.
  • Fabricate and fit left and right clack boxes to O&K standards.
  • Rebuild no 1 and no 2 buffer beams and buffers to O&K standards.
  • Refit missing left water injector and refit right water injector.
  • Prepare locomotive boiler for a hydraulic and steam test to obtain a valid boiler certificate.
  • Retest and certify boiler pressure gauge.
  • Fit brass cladding to left and right cylinders.
  • Grind and polish left and right side rods and valve motion gear.
  • Paint locomotive and frames.
 

Most of this work is programmed for 2010.

image001

12th October 2009

The riveted side tanks of O&K 10311.

image002

Leave a Reply

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.