THE LITTLE RATANGA LOCOMOTIVE: |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
The boiler of this locomotive was still full of water. The locomotive was re-railed this week. We drained the water and acid washed the boiler till it was crystal clear inside. The fire bars were removed and the complete boiler and inner firebox was de-scaled and painted with red oxide paint. This boiler will be given a hydraulic water test and will be ready for boiler inspection at the end of this month.
The running boards, cylinder covers and smoke deflectors were sanded of and painted with red oxide. This will now be flattened and spray painted before it is assembled again. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| On the sides of the smoke deflectors we found two brass plates upside down. When we took it of we discovered that “Miss Brakpan” was engraved on the other side. We still need to find a name for this little angel. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| BOILER INSPECTIONS: The little locomotive was not the only locomotive that was washed out this week. Two class NGG 16’s; numbers 113 and 153 was washed out and are prepared for the internal Boiler Inspection by the end of this month. We still need to wash out and prepare the Fowler locomotive too. Eight boilers will be inspected by our Boiler Inspector Willie Lottering. The boiler inspections are in three stages namely, internal, hydraulic and steam test. This is planned to be done in three days and therefore needs to be properly planned. The internal test is only a visual inspection with all the wash out plugs and mud hole covers of. This includes a hardness test on the boiler as well. We then have to place all plugs and mud hole covers back and will need to fill the boilers for hydraulic test. The boilers will be hydraulic at 25% higher water pressure than the normal working pressure of the boilers and must be in such a state to maintain that pressure without any leaks. Once this is done we need to drain the boilers to the correct level of water in the gauge glasses to steam them on the third day. The safety valves then need to be set at the correct working pressure. Because of the limited time and the quantity of boilers to be tested, I shall need all the hands working in the steam shed for the three days. Here are photos of the wash outs this week: |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||