STEAM NEWS FROM KOMMANDONEK

This week we moved all the remaining wagons and coaches from Kommandonek to the storage lines on the Estates. We start with the offloading of the Guards van on Monday morning.

Below: Photos taken while offloading the van.

 

report 10 742.jpg

report 10 735.jpg

We immediately left for Kommandonek and loaded a caboose before we loaded the Elephant wagon. The Elephant wagon was very high and top heavy and we transported her with great respect.

report 10 761.jpg

report 10 748.jpg

First of all we had to remove the pivot brackets and all the braking gears to separate the frame from the bogeys. The wagon is lifted and the front bogey removed with the help of the Forklift.

   report 10 808.jpg

report 10 775.jpg

The Freightliner reverse in under the wagon and the wagon is lowered onto the fifth wheel of the Freightliner. This needs proper alignment to accommodate the bolts through the holes in the wagon frame and fifth wheel plate holes. Once this bolts are secured, the crane stand off and the Freightliner pulls the wagon forward to lift the rear of the wagon. Once the rear bogey is removed, the dolly wheel is moved in under the wagon with the help of the Forklift. 

report 10 822.jpg

report 10 810.jpg

Below: The Elephant wagon arrives at Sandstone Estates.

 

report 10 849.jpg

report 10 844.jpg

Because of limited space because of the storage line almost full of wagons, we had to lift the dolly wheel out with the help of the Forklift.

Below Left: The Dolly wheel being removed!

Below Right: The bolts on the fifth wheel of the Freightliner were loosened and the wagon lifted to clear the fifth wheel when the Freightliner pulls out.

report 10 857.jpg

report 10 856.jpg

Below: The Elephant wagon swinging in the air while the Freightliner pulls out. The front bogey is then placed on the rail and moved by hand in under the wagon. Again it is essential to have perfect alignment to lower the wagon into the pivot on the bogey.

report 10 865.jpg

This was the last goods wagon that was moved and it was time to move on to the heavy passenger wagons.

The passenger wagons were freer running because of the roller bearings fitted to them and the tractor was used just to bring them into motion. The wagons ran on their own all the way down to the stop block.

 

report 10 837.jpg

report 10 890.jpg

The passenger wagons were too heavy to lift with the crane and we used the Forklift to help with the lifting of the wagons. This caused a little problem, to remove the bogeys and to fit the Dolly wheel in under the coach. We lifted the coach and pulled the bogey from the rails with the tractor. The Dolly wheel had to be rolled in under by hand.

 

report 10 893.jpg

report 10 901.jpg

Below: The loading of the 20 meter coach weighing 37ton.

It helped a lot to prevent the coach from swinging when the Forklift is used to help lifting the long coaches.

 

report 10 903.jpg

report 10 931.jpg

 

report 10 932.jpg

report 10 939.jpg

Below right: Arno about to cut holes in the frame to secure the Dolly wheels to the frame of the coach.

 

report 10 947.jpg

report 10 959.jpg

Below: After 6 hours of loading, the coach was on her way to the Farm and was offloaded just before dusk.

 

report 10 965.jpg

report 10 992.jpg

Early the next morning we left for Kommandonek to load the second coach.

 

report 10 1001.jpg

report 10 1017.jpg

A total of 7 goods wagons and 5 passenger coaches were moved from Kommandonek to Sandstone Estates.

Below: Action photos taken of the coach being loaded.

report 10 1027.jpg

Below: Henk securing the front part of the Dolly wheels with a block and tackle.

 

report 10 1036.jpg

report 10 1050.jpg

Below: A coach being offloaded at Hoekfontein storage line.

report 10 1053.jpg

Below: The Freightliner ready to depart to the Farm.

report 10 1115.jpg

Below Left: Confined space where the pivot rings and braking gears are situated.

 

report 10 1071.jpg

We only had one little mishap with this operation, when Henk drove over Henry’s coffee flask with a ten ton Forklift. It is only suitable now to keep pancakes warm! 🙂

report 10 1105.jpg

RATANGA LOCOMOTIVE:

Menasse and his team sanded the tank of the front unit and spray painted it. They were busy most of the week with the restoration of a Ratanga passenger wagon and are making good progress. Photos of the Ratanga wagon will be in next weeks report.

report 10 1055.jpg

 

OUTLOOK FOR NEXT WEEK!

 9.jpg

  • Ratanga Boiler restoration.

  • Ratanga engine unit restoration.

  • To fit boiler onto engine units.

  • To spray boiler with red oxide.

  • Restoration of cowcatcher for Ratanga locomotive.

  • BSA restoration.

  • To offload last passenger wagon from Kommandonek.

  • To shunt all wagons back into new storage line.

  • To load wagons onto flat wagons to free-up space to accommodate more wagons on storage line.

  • Ratanga wagon restoration.

  • To clean all coaches from Kommandonek.

  • To washout number 153.

  • To service Forklift for Port Shepstone wayside stations.

STEAM GREETINGS!
THE STEAM TEAM!

Leave a Reply

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.